costa crianlarich
1661 hits
Replacement Tree Queens Diamond Jubilee
1737 hits
Decking
1665 hits
Decking
1820 hits
Deck Founds
1673 hits
Emergency Exit
1582 hits
New Foodstore Fridge
1593 hits
IMG_1840.jpg
1551 hits
Kitchen
1637 hits
Dining Area
1618 hits
Patio Ent
1554 hits
Decorating Dining
1591 hits
Hall
1544 hits
Disposal of Old Kitchen
1457 hits
Store Floor
1601 hits
Store Floor
1576 hits
Lunch
1659 hits
Food Store Framing
1592 hits
New Link Corridor
1547 hits
Framing Old Kitch Ex Wall
1649 hits
Disposal of Old Kitchen
1474 hits
Old Kitchen
1610 hits
Framing Old Kitch Ex Wall
1606 hits
Kitchen
1681 hits
Old Kitchen
1730 hits
Breakfast Without Kitchen
1645 hits
IMG_1768.jpg
1650 hits
IMG_1754.jpg
1647 hits
Breakthrough
1644 hits
Just before the breakthrough (21.11.11)
1689 hits
New kitchen workbenches
1695 hits
Kitchen dismantling team (21.11.11)
1745 hits
Kitchen
1630 hits
Exterior Decor
1601 hits
2011.11 01 Blockwork Comp
1729 hits
2011.11 06 Insulation Team
1754 hits
2011.11 04 Ames Tape Members Room
1829 hits
2011.11 07 Ready for Decoration
1694 hits
2011.11 03 Ames Tapers Apprentice
1671 hits
2011.11 05 Plas'd to Comb
1647 hits
2011.11 02 Ames Taping
1642 hits
2011.10 Wall Completion Members Room
1602 hits
2011.10 Plaster Board to Members Room
1643 hits
2011_10 70 Superstructure.JPG
1656 hits
2011_10 69 Plas_d 1st Fix.JPG
1648 hits
2011_10 68 Plas_d 1st Fix.JPG
1557 hits
2011-10 Dining Area
1313 hits
2011-10 Kitchen Wall
1294 hits
2011-10 First Wall Board
1337 hits
2011-10 First Ceiling Board
1309 hits
2011-09 Which is the Apprentice.JPG
1546 hits
2011-09 A Well Earned Break.JPG
1567 hits
2011-09 Comb Insulation Preparation.JPG
1573 hits
2011-09 Electrical Cabling.JPG
1438 hits
2011-09 Attic Insulation.JPG
1504 hits
2011.09 Forming Members Room
1370 hits
2011.09 Prep for Insulation
1336 hits
2011.09 Installing Insulation
1420 hits
2011.09 Fitting Ceiling Dwangs
3078 hits
2011.09 New Flooring
1370 hits
2011.09 First Highland Jig
1460 hits
100_0162.JPG
1395 hits
Extension 3 31/8/11
1408 hits
Extension 2 31/8/11
1533 hits
Club cottage extension 1 31/8/11
1531 hits
28 Aug '11 - Kit & Truss Progress
1549 hits
2011.08 Deliveries
1397 hits
CCX_28_Aug_2011_c
1402 hits
CCX_28_Aug_2011_b
1451 hits
CCX_28_Aug_2011_a
1462 hits
The boulders dug out
1331 hits
Work in progress 30 June 2011
1406 hits
Base for the new extension (July 16th)
1380 hits
Base for new extension
1429 hits
Tea Party
1578 hits