costa crianlarich
1648 hits
Replacement Tree Queens Diamond Jubilee
1728 hits
Decking
1657 hits
Decking
1812 hits
Deck Founds
1666 hits
Emergency Exit
1576 hits
New Foodstore Fridge
1585 hits
IMG_1840.jpg
1546 hits
Kitchen
1627 hits
Dining Area
1607 hits
Patio Ent
1546 hits
Decorating Dining
1582 hits
Hall
1536 hits
Disposal of Old Kitchen
1450 hits
Store Floor
1589 hits
Store Floor
1571 hits
Lunch
1651 hits
Food Store Framing
1587 hits
New Link Corridor
1538 hits
Framing Old Kitch Ex Wall
1641 hits
Disposal of Old Kitchen
1469 hits
Old Kitchen
1599 hits
Framing Old Kitch Ex Wall
1598 hits
Kitchen
1667 hits
Old Kitchen
1721 hits
Breakfast Without Kitchen
1634 hits
IMG_1768.jpg
1646 hits
IMG_1754.jpg
1638 hits
Breakthrough
1634 hits
Just before the breakthrough (21.11.11)
1682 hits
New kitchen workbenches
1691 hits
Kitchen dismantling team (21.11.11)
1738 hits
Kitchen
1625 hits
Exterior Decor
1596 hits
2011.11 01 Blockwork Comp
1725 hits
2011.11 06 Insulation Team
1749 hits
2011.11 04 Ames Tape Members Room
1825 hits
2011.11 07 Ready for Decoration
1688 hits
2011.11 03 Ames Tapers Apprentice
1664 hits
2011.11 05 Plas'd to Comb
1639 hits
2011.11 02 Ames Taping
1634 hits
2011.10 Wall Completion Members Room
1595 hits
2011.10 Plaster Board to Members Room
1636 hits
2011_10 70 Superstructure.JPG
1647 hits
2011_10 69 Plas_d 1st Fix.JPG
1643 hits
2011_10 68 Plas_d 1st Fix.JPG
1551 hits
2011-10 Dining Area
1306 hits
2011-10 Kitchen Wall
1287 hits
2011-10 First Wall Board
1333 hits
2011-10 First Ceiling Board
1302 hits
2011-09 Which is the Apprentice.JPG
1538 hits
2011-09 A Well Earned Break.JPG
1561 hits
2011-09 Comb Insulation Preparation.JPG
1567 hits
2011-09 Electrical Cabling.JPG
1430 hits
2011-09 Attic Insulation.JPG
1497 hits
2011.09 Forming Members Room
1364 hits
2011.09 Prep for Insulation
1331 hits
2011.09 Installing Insulation
1409 hits
2011.09 Fitting Ceiling Dwangs
3065 hits
2011.09 New Flooring
1363 hits
2011.09 First Highland Jig
1453 hits
100_0162.JPG
1386 hits
Extension 3 31/8/11
1403 hits
Extension 2 31/8/11
1526 hits
Club cottage extension 1 31/8/11
1528 hits
28 Aug '11 - Kit & Truss Progress
1544 hits
2011.08 Deliveries
1390 hits
CCX_28_Aug_2011_c
1398 hits
CCX_28_Aug_2011_b
1445 hits
CCX_28_Aug_2011_a
1455 hits
The boulders dug out
1300 hits
Work in progress 30 June 2011
1375 hits
Base for the new extension (July 16th)
1363 hits
Base for new extension
1425 hits
Tea Party
1570 hits