costa crianlarich
1660 hits
Replacement Tree Queens Diamond Jubilee
1736 hits
Decking
1665 hits
Decking
1819 hits
Deck Founds
1672 hits
Emergency Exit
1581 hits
New Foodstore Fridge
1590 hits
IMG_1840.jpg
1549 hits
Kitchen
1630 hits
Dining Area
1610 hits
Patio Ent
1548 hits
Decorating Dining
1586 hits
Hall
1542 hits
Disposal of Old Kitchen
1455 hits
Store Floor
1594 hits
Store Floor
1572 hits
Lunch
1655 hits
Food Store Framing
1588 hits
New Link Corridor
1544 hits
Framing Old Kitch Ex Wall
1642 hits
Disposal of Old Kitchen
1471 hits
Old Kitchen
1604 hits
Framing Old Kitch Ex Wall
1602 hits
Kitchen
1671 hits
Old Kitchen
1724 hits
Breakfast Without Kitchen
1637 hits
IMG_1768.jpg
1648 hits
IMG_1754.jpg
1639 hits
Breakthrough
1639 hits
Just before the breakthrough (21.11.11)
1687 hits
New kitchen workbenches
1694 hits
Kitchen dismantling team (21.11.11)
1742 hits
Kitchen
1629 hits
Exterior Decor
1598 hits
2011.11 01 Blockwork Comp
1726 hits
2011.11 06 Insulation Team
1752 hits
2011.11 04 Ames Tape Members Room
1828 hits
2011.11 07 Ready for Decoration
1692 hits
2011.11 03 Ames Tapers Apprentice
1669 hits
2011.11 05 Plas'd to Comb
1644 hits
2011.11 02 Ames Taping
1641 hits
2011.10 Wall Completion Members Room
1598 hits
2011.10 Plaster Board to Members Room
1640 hits
2011_10 70 Superstructure.JPG
1654 hits
2011_10 69 Plas_d 1st Fix.JPG
1646 hits
2011_10 68 Plas_d 1st Fix.JPG
1556 hits
2011-10 Dining Area
1309 hits
2011-10 Kitchen Wall
1292 hits
2011-10 First Wall Board
1334 hits
2011-10 First Ceiling Board
1308 hits
2011-09 Which is the Apprentice.JPG
1542 hits
2011-09 A Well Earned Break.JPG
1564 hits
2011-09 Comb Insulation Preparation.JPG
1570 hits
2011-09 Electrical Cabling.JPG
1435 hits
2011-09 Attic Insulation.JPG
1501 hits
2011.09 Forming Members Room
1367 hits
2011.09 Prep for Insulation
1333 hits
2011.09 Installing Insulation
1414 hits
2011.09 Fitting Ceiling Dwangs
3075 hits
2011.09 New Flooring
1368 hits
2011.09 First Highland Jig
1459 hits
100_0162.JPG
1392 hits
Extension 3 31/8/11
1407 hits
Extension 2 31/8/11
1532 hits
Club cottage extension 1 31/8/11
1531 hits
28 Aug '11 - Kit & Truss Progress
1547 hits
2011.08 Deliveries
1395 hits
CCX_28_Aug_2011_c
1401 hits
CCX_28_Aug_2011_b
1449 hits
CCX_28_Aug_2011_a
1459 hits
The boulders dug out
1329 hits
Work in progress 30 June 2011
1404 hits
Base for the new extension (July 16th)
1378 hits
Base for new extension
1428 hits
Tea Party
1575 hits