costa crianlarich
1660 hits
Replacement Tree Queens Diamond Jubilee
1736 hits
Decking
1665 hits
Decking
1819 hits
Deck Founds
1673 hits
Emergency Exit
1581 hits
New Foodstore Fridge
1591 hits
IMG_1840.jpg
1550 hits
Kitchen
1631 hits
Dining Area
1610 hits
Patio Ent
1549 hits
Decorating Dining
1586 hits
Hall
1543 hits
Disposal of Old Kitchen
1456 hits
Store Floor
1595 hits
Store Floor
1573 hits
Lunch
1656 hits
Food Store Framing
1588 hits
New Link Corridor
1544 hits
Framing Old Kitch Ex Wall
1643 hits
Disposal of Old Kitchen
1472 hits
Old Kitchen
1605 hits
Framing Old Kitch Ex Wall
1602 hits
Kitchen
1673 hits
Old Kitchen
1724 hits
Breakfast Without Kitchen
1637 hits
IMG_1768.jpg
1648 hits
IMG_1754.jpg
1639 hits
Breakthrough
1639 hits
Just before the breakthrough (21.11.11)
1687 hits
New kitchen workbenches
1694 hits
Kitchen dismantling team (21.11.11)
1743 hits
Kitchen
1629 hits
Exterior Decor
1598 hits
2011.11 01 Blockwork Comp
1727 hits
2011.11 06 Insulation Team
1752 hits
2011.11 04 Ames Tape Members Room
1828 hits
2011.11 07 Ready for Decoration
1693 hits
2011.11 03 Ames Tapers Apprentice
1669 hits
2011.11 05 Plas'd to Comb
1644 hits
2011.11 02 Ames Taping
1641 hits
2011.10 Wall Completion Members Room
1599 hits
2011.10 Plaster Board to Members Room
1640 hits
2011_10 70 Superstructure.JPG
1654 hits
2011_10 69 Plas_d 1st Fix.JPG
1647 hits
2011_10 68 Plas_d 1st Fix.JPG
1556 hits
2011-10 Dining Area
1309 hits
2011-10 Kitchen Wall
1293 hits
2011-10 First Wall Board
1335 hits
2011-10 First Ceiling Board
1308 hits
2011-09 Which is the Apprentice.JPG
1543 hits
2011-09 A Well Earned Break.JPG
1564 hits
2011-09 Comb Insulation Preparation.JPG
1570 hits
2011-09 Electrical Cabling.JPG
1436 hits
2011-09 Attic Insulation.JPG
1502 hits
2011.09 Forming Members Room
1368 hits
2011.09 Prep for Insulation
1334 hits
2011.09 Installing Insulation
1415 hits
2011.09 Fitting Ceiling Dwangs
3075 hits
2011.09 New Flooring
1368 hits
2011.09 First Highland Jig
1459 hits
100_0162.JPG
1392 hits
Extension 3 31/8/11
1407 hits
Extension 2 31/8/11
1532 hits
Club cottage extension 1 31/8/11
1531 hits
28 Aug '11 - Kit & Truss Progress
1547 hits
2011.08 Deliveries
1395 hits
CCX_28_Aug_2011_c
1401 hits
CCX_28_Aug_2011_b
1450 hits
CCX_28_Aug_2011_a
1460 hits
The boulders dug out
1330 hits
Work in progress 30 June 2011
1405 hits
Base for the new extension (July 16th)
1379 hits
Base for new extension
1428 hits
Tea Party
1576 hits